MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_NextPart_01C47962.CFEE18A0" This document is a Single File Web Page, also known as a Web Archive file. If you are seeing this message, your browser or editor doesn't support Web Archive files. Please download a browser that supports Web Archive, such as Microsoft Internet Explorer. ------=_NextPart_01C47962.CFEE18A0 Content-Location: file:///C:/6338DA77/admin_SOP_20020527.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii" www

=  

 

 

 

General Office Administration

Standard Operating Pro= cedure

 

by Rita Wang

 

 

Created: 27 May 2002

 

 

 

 

 

 

Tabl= e of Content

 

= 1&= nbsp;    Amendments. 1

2     Answering = Phone Calls. <= /span>1

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>2.1     Hunting Line Programming.. 1

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>2.2     Who should answer the call ?. 1

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>2.3     Checking Voice Mail. 1

3     Checking Letterbox.. = 1

4     Office Sup= plies. 2

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>4.1     Ordering Procedure.. 2

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>4.2     Minimum stock.. 2

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>4.3     Standard Items for New Staff. 2

5     Pantry Sup= plies. 2

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>5.1     Ordering Procedure.. 2

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>5.2     Distilled Water.. 3

<= span style=3D'mso-prop-change:"Eric Tachibana" 20040803T1404'>5.3     Other Pantry Items. 3

6     Adding/Cha= nging Suppliers. <= /span>3

7     Travel Arrangements. 3

8     Staff Even= ts. 4

9     Tracking of Domain Names and Service Providers. 4

10       Managing the meeting room (conference room). 4

11       Time Sheets. <= /span>5

12       Appendices. 6

 


1&nb= sp;         Amendments

 

Amendment=

Dates

Descripti= on

Author

New file name

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2&nb= sp;          Answering Phone Calls

= 2.1  Hunt= ing Line Programming

The company hunting line should be programmed such tha= t it will ring at the desk of the staff in the following order:

2.1.1   Administrative Assistant

2.1.2   Finance room
2.1.3   Sales Staff

2.1.4   Project Managers

2.1.5   Finally, the call will go into voice mail if no one = is available to pick up the call after 12 rings.

 

= 2.2  Who = should answer the call ?

The Administrative Assistant will be the primary staff= to answer to phone calls.  In the= case that the Admin Assistant is away from his/her desk (sick leave, lunch breaks and toilet breaks etc), he/she should explicitly assign a staff to answer p= hone calls during his/her absence.  Staff will be asked to help in the following order:

2.2.1=       = Manager – Admin & Operations

2.2.2=       = Other Admin staff (COO & Business Development Director)

2.2.3=       = Business Development Executives

2.2.4=       = Business Development Manager

2.2.5=       = CEO

2.2.6=       = Project Managers

2.2.7=       = Senior Project Managers

2.2.8=       = Project Director

2.2.9=       = Any Developers/Infrastructure staff who is available in the office

 

= 2.3  Chec= king Voice Mail

2.3.1=      The Admin Assista= nt (or the assigned staff if the Admin Assistant is absent) should check the main = line voice mail first thing in the morning and after lunch and pass the messages= to the respective staff.  Procedu= res:

2.3.1.22.3.1.32.3.1.42.3.2       Whenever the main line is chosen (64791172) = and a discontinuous tone is heard, it means that there is a voice mail waiting = to be retrieved.  The Admin Assis= tant or (or the assigned staff if the Admin Assistant is absent) should retrieve= the message immediately and pass it to the respective staff.

 

3&nb= sp;          Checking Letterbox

The Admin Assistant is given the key to the letter box= .   The letterbox should be chec= ked once everyday (preferably in the afternoon when the mails are just delivere= d) except for Monday or the first day after the long weekend when the letterbox needs to be checked twice (i.e. once in the morning and once in the afterno= on).

 

4&nb= sp;          Office Supplies

4.1      = Ordering Procedure

4.1.1   Prepare list of items to order

4.1.2   Fax to the supplier to get quotation

4.1.3   Compare prices with the ones in the previous order

4.1.4   Submit to the Admin & Operations Manager for approval

4.1.5   Fax back confirmation to the supplier

4.1.5   Check goods against the order confirmation when the stationery is delivered

4.1.6   File invoice in the “Payment” folder

=  

= 4.2  Mini= mum stock

Minimum stock needs to be kept for the following stati= onery items:

4.2.1=       = Laser jet cartridges (2 pcs)

4.2.2=       = Fax machine film (2 boxes i.e. 4 pcs)

4.2.3=       = 80gsm A4 plain papers for printer (10 rims)

4.2.4=       = 70gsm A4 plain papers for fax machine and photocopier (10 rims)

4.2.5=       = Pilot Techo(?) Pens V5 – blue, black and red colors (5 pcs each)

4.2.6=       = Pencils (5 pcs)

4.2.7=       = Highlighters – assorted colors (5pcs)

4.2.8=       = Paper Clips (5 boxes)

4.2.9=       = Black Metal clips – large (1 box), medium (1 box) and small size (2 boxes)<= /p>

4.2.1= 0   Staples for HD100 staplers (5 boxes)

4.2.1= 1   Writing pads (5 pcs)

4.2.1= 2   Transparent folders (6 pcs)

4.2.1= 3   3-inch arch files – black (6 pcs), blue (3 pcs) and red (3pcs)

4.2.1= 4   2-inch arch files – black (3 pcs)

4.2.1= 5   3.5” floppy disk (1 box of 12 pcs)

4.2.1= 6   White Board Marker (Artline 500, thicker ones) – black, blue, green, red co= lors (3 pcs each)

4.2.1= 7   Scotch Tapes – 5 pcs

4.2.1= 8   Uhu Glues (medium) – 2 pcs

 

4.3      = Standard Items for New Staff

4.3.1=       = Pilot Techo Pens V5 – blue, black and red (one each)

4.3.2=       = Pencils (2 pcs)

4.3.3=       = Ruler (1 pc)

4.3.4=       = Scissors (1 pc)

4.3.5=       = F4 hardcover note book (1 pc)

4.3.6=       = HD100 Stapler (1 pc)

4.3.7=       = Staples (1 box)

4.3.8=       = Highlighter (1 pc)

4.3.9=       = Pencil Sharpener (1 pc)

4.3.1= 0   Paper Clips

 

5&nb= sp;          Pantry Supplies

5.1      = Ordering Procedure

5.1.1   Prepare a list of items to order

5.1.3   Submit to the Admin & Operations Manager for approval

5.1.4   Send orders to the supplier

5.1.5   Check goods against the order confirmation when the supplies  are delivered

5.1.6   File invoice in the “Payment” folder

 

= 5.2  Dist= illed Water

Order 7 bottles when the last bottle has been put onto= the dispenser.  Ideally, a standing order can be placed with the supplier so that water will be delivered constantly after a specified period.

 

= 5.3  Othe= r Pantry Items

Budget is $140.00 per month.  Order only once a month (around 15= th of the month).

 

6&nb= sp;      FF&a= mp;E Planning & Purchases

Planning

Purchases

Delivery

Keeping receipts and warranty cards

Inventory Listing

 

 

67    Adding/Changing Suppliers

Follo= w the procedures:

6.1.1=       = Acquire quotations from the new supplier

6.1.2=       = Submit to shareholders for approval

6.1.3=       = Once approved, plans must be made for transition from the old supplier to the new supplier to ensure that there is no interruption of services which may affe= ct daily operation of the company.

6.1.4=       = Finally, implement the new service

=  

78    Travel Arrangements

7.1   The following information mus= t be provided by the staff who is going to travel:

7.1.1     Preferred date and time of departure

7.1.2     Preferred date and time of return

7.1.3     Destination

7.1.4=      Preferred hotel (= and any request e.g. single room, non-smoking room etc)

7.1.5     Name of the project and client’s n= ame

7.1.6=      Purposes of the t= rip for each day – e.g. For project, joint business development exercise = with a client (e.g. MYBiz P3), sales or personal

7.2   The responsi= ble staff who makes the booking will enter all the information into the travel itinerary spreadsheet.  See Ap= pendix A for a sample of travel itinerary spreadsheet.

7.3   Flight booki= ng - The responsible staff will call airlines/travel agent to make the necessary flight bookings.  When the airlines/travel agent confirms the bookings, update the status of the sector onto the travel itinerary spreadsheet.

7.4   Hotel bookin= g and rooming arrangement

7.4.1    Accommodation in <= st1:City w:st=3D"on">Kuala Lumpur – The service apartm= ent provided by the client should be occupied first before booking any addition= al rooms.  The CEO and CTO are en= titled to stay in the master bedroom and second best room respectively.

7.4.2    Acco= mmodation in other countries – bookings can be made through different sources, = e.g. internet, travel agent, direct booking with the hotels.  However, the cost of the accommoda= tion and flexibility of changing the bookings (in case of change of itinerary) should always be taken into consideration.

7.5   Once the booking is made, the person who = will be traveling should be informed of the confirmed itinerary and rooming arrangement, and given the deadline to make any changes or confirm his/her itinerary.

7.6.   Before issu= ing any air tickets or giving credit card details/signature for the hotel accommodation, the Admin Assistant should confirm again with the staff who = is going to travel.

7.7.  At the end of the= week (before 5pm of Friday or the day before a long weekend), send a zipped trav= el itinerary file to all staff so that every staff  is aware of each other’s whereabouts for the coming week.

7.8.=   Cancellation Procedures = 211; as soon as the cancellation of the trip is known, the staff should inform the person-in-charge of the travel arrangement immediately.  The person-in-charge shou= ld then try to cancel all flights and hotel bookings with= out invo= lving any pena= lty charge.  Ethically, the = hotel should be informed immediately even though no credit card guarantee was giv= en.

=  

9&nb= sp;          Standard Forms<= /a>

Circulation Forms<= /span>

Leave application Form (= pls refer to HR SOPs)<= /p>

Expense Claim Form= <= /span>

Payment Vou<= /span>chers= <= /span>

Petty Cash Form<= /span>

Timesheets<= /span>

Job Application Forms<= /span>

 <= /ins>

10      =    Security=

Office Security R= 11; keys, client informatio= n<= /span>

Network Access<= /span>

Insurance against Theft = & Fire <= /p>

 <= /ins>

811  Staff Events

8.1    Movie day – norma= lly, there will be one movie day every three months

8.2    Overseas retreat – ideally, there will be one overseas retreat per year.

8.3    Staff Birthday – = mini party with birthday cake and/or snacks.&nb= sp; If birthdays of a few staff in a month are close to each other, it is more advisable to combine the funds for each birthday party and plan for a bigger party.

8.4    Quarterly all-staff mee= ting to be addressed by the CEO of the company – usually combined with one= of the staff events with food catering.

8.5    There may be some other private events to be organized by individual staff in between the company s= taff events.   The company may= or may not consider subsidizing these individual events.  Usually, if the participating rate= by our staff is high, it is more justifiable for the company to subsidize such private event but it is completely up to the shareholders’ decision.<= /p>

=  

912  Tracking of Domain Names and Service Providers

9.1&= nbsp;         The Administrators – The Systems Group= for technical issues and the Administrative Department for admin and payment issues.

9.2&= nbsp;         The DNS and ISP Database – The database should be constantly updated as and when any status (e.g. contract term, contact person etc) of each domain name is changed.  The updated database should be ema= iled to the Systems Group and Admin Department by 5pm of the last day of each month.  See Appendix B for a sample of the Database (spreadsheet).

9.3&= nbsp;         Registration company - Whenever possible, re= new a domain name under the same registration company to minimize the admin wor= k of co-ordinating with different registration companies. 

9.4&= nbsp;         DNS renewal procedures -

9.4.1           One month before the renewal deadline of each DNS, seek approval of shareholders before the renewal.  The shareholders should be given sufficient information for their decisions (e.g. the DNS name, proposed ext= ension period, yearly costs etc).

9.4.2           For important domain names (e.g. eXtropia.com and eXtropiabanking.com), the DNS should preferably be renewed for five years.  Other DNS can be renew= ed for one or two years, depending on shareholders’ preference.

9.4.3           Whenever possible, pay the registration by remittance or by corporate credit card by fax.  Avoid providing details of personal credit cards over the internet.

9.4.4           Subscribe to at least two web reminder services.  Configure to send reminder to admin@companyname<= /span>eXtropia.com once every one month, two weeks and two days before expiry of each domain n= ame.

=  

1013      =             Managing the meeting room (conf= erence room)

10.1=              As and when a meeting has been set up, the d= ate, time and venue of the meeting has to be entered into the office calendar (intranet web cal) by the person who set up the meeting.

10.2=              The Admin Assistant is the key person who ke= eps track on the meeting room booking status.&= nbsp; As soon as he/she notices a conflict of usage of the meeting room, he/she should inform the party involved immediately and rectify the conflict.  New meeting date, t= ime and venue should be entered in the office calendar accordingly.

10.3=              Every morning, the admin assistant will write all meeting appointments on the board next to the conference room door.  Any staff who wishes to use the me= eting room between the booked slots during the day should inform the Admin Assist= ant who will enter the new bookings onto the board.

=  

1114      =             Time Sheets

There= are two different types of time sheets:

11.1<= span style=3D'font:7.0pt "Times New Roman"'>      =     Project time sheet

11.1.1 The project time sheet is used especially if a project income is billed to the client on a time-and-material basis. See Appendix B for a sample of the Pro= ject Time Sheet.

11.1.2 A pr= oject time sheet template should be emailed to all involved staff (developers, Project Manager, Project Director, Business Development staff for the proje= ct) on this project in the beginning of the month. 

11.1.3 One = week before last day of the month, a reminder should be sent to each involved st= aff to submit the time sheet. 

11.1.4 Two = days before last day of the monthly, a reminder should be sent again.

11.1.5 Afte= r the deadline, the staff who has not submitted his/her time sheet will be remind= ed (by email and in person) once every two days until he/she finally submit the time sheet.

11.1.6 It is advisable to subscribe to a web reminder service to ease the admin workload= of the person-in-charge to send reminder emails.

11.2<= span style=3D'font:7.0pt "Times New Roman"'>      =     Support and maintenance (S&M) time sheet=

11.2.1 The S&M time sheet is used by staff who are involved in solving any support= and maintenance issues to keep track on the time that they spend for regular maintenance matters and any billing required for out-of-scope (non-working hours and on-site) work done for the client.  See Appendix C for a sample of the support and maintenance timesheet.

11.2.2 Each technical staff should be given a S&M time sheet template.  The staff should be able to modify= the Project Name, and Start Date and End Date of the week and use the same template to record time spent weekly.

11.2.3 It i= s the Project Manager’s responsibility to inform the person-in-charge who gathers together time sheets on a weekly basis as soon as a support and maintenance issue arise.  He s= hould also advise the name of the technical staff who is assigned to solve the problem and a brief problem description in less than five words.

11.2.4 As s= oon as the person-in-charge is informed, he/she should key in the name of the tech staff and the problem description into the Master Tracking sheet as a remin= der to gather time sheet from the technical staff at the end of the month.  See Appendix D for a sample of the Master Tracking Sheet.

11.2.5 The technical staff involved should be sent a reminder to fill in time sheet as soon as the person-in-charge is aware of the S&M issue.

11.2.6 One = week before last day of the month, a reminder should be sent to each involved st= aff to submit the time sheet. 

11.2.7 Two = days before last day of the monthly, a reminder should be sent again.

11.2.8 Afte= r the deadline, the staff who has not submitted his/her time sheet will be remind= ed (by email and in person) once every two days until he/she finally submit th= e time sheet.

11.2.9 It is advisable to subscribe to a web reminder service to ease the admin workload= of the person-in-charge to send reminder emails.

 

= 1215      =             Appendices

Appendix A:   Sample of travel itinerary spreadsheet.

Appendix B:  = ;  Sample of the Project Time Sheet.

Appendix C:   Sample of the Support and Maintenance timesheet.

Appen= dix D:    Sample of the Master Tr= acking Sheet (Support and Maintenance timesheet).

Appendix E:  &nbs= p; Supplier’s contact details

Appendix F:&n= bsp;   Forms

 

------=_NextPart_01C47962.CFEE18A0 Content-Location: file:///C:/6338DA77/admin_SOP_20020527_files/header.htm Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset="us-ascii"





PAGE  <= span style=3D'font-family:Verdana'>

 

PAGE  1

File:admin_SOP_Rita_20020526.doc

------=_NextPart_01C47962.CFEE18A0 Content-Location: file:///C:/6338DA77/admin_SOP_20020527_files/filelist.xml Content-Transfer-Encoding: quoted-printable Content-Type: text/xml; charset="utf-8" ------=_NextPart_01C47962.CFEE18A0--